TABLE OF CONTENTS
CONTENTS ...............................................PAGE
1.0 INTRODUCTION ............................................. 3
2.0 SPECIFICATIONS.............................................6
3.0 BOILER LOCATION .........................................8
4.0 GENERAL VENTING .....................................11
5.0 VENT/AIR-INLET TERMINATION
CLEARANCES ...............................................25
6.0 CONDENSATE DRAIN .................................. 28
7.0 INSTALLING GAS PIPING .............................30
8.0 LIGHTING THE BOILER ................................32
9.0 GAS VALVE AND BURNER SET-UP ............. 34
10.0 BOILER AND HEATING SYSTEM PIPING ....37
11.0 FIELD WIRING ...............................................52
12.0 WIRING SCHEMATICS...................................57
13.0 INSTALLATION CHECKLIST .........................59
14.0 ANNUAL MAINTENANCE AND
INSPECTION .................................................60
15.0 TROUBLESHOOTING ...................................62
16.0 PARTS LIST ..................................................85
MODELS CHS-85 through CHS-399
INSTALLATION AND OPERATING INSTRUCTIONS
IMPORTANT
READ ALL OF THE FOLLOWING WARNINGS AND STATEMENTS
BEFORE READING THE INSTALLATION INSTRUCTIONS
This manual
must be left
with owner and
should be hung
on or adjacent
to the boiler
for reference.
®
CUS
HIGH EFFICIENCY FIRE TUBE
CONDENSING GAS BOILER
©Slant/Fin Corp. 2014 •
1014 • PUBLICATION CHS-40
Heating Contractor
Address
Phone Number
Boiler Model Number
Boiler Serial Number
Installation Date
!
DANGER
Danger Sign: Indicates a hazardous situation which,
if not avoided, will result in serious injury or death.
Warning Sign: Indicates a hazardous situation which,
if not avoided, could result in serious injury or death.
Caution Sign plus Safety Alert Symbol: Indicates a hazardous situa-
tion which, if not avoided, could result in minor or moderate injury.
Caution Sign without Safety Alert Symbol: Indicates a hazardous
situation which, if not avoided, could result in property damage.
Notice Sign: Indicates a hazardous situation which, if
not avoided, could result in property damage.
This Boiler must be installed by a licensed and trained Heating Techni-
cian or the Warranty is Void. Failure to properly install thisunit may re-
sult in property damage, serious injury to occupants, or possibly death.
!
WARNING
!
CAUTION
CAUTION
NOTICE
!
WARNING
Seitenansicht 0
1 2 3 4 5 6 ... 91 92

Inhaltsverzeichnis

Seite 1 - CONDENSING GAS BOILER

TABLE OF CONTENTS CONTENTS ...PAGE 1.0 INTRODUCTION ...

Seite 2

Slant Fin Corp. │ Installation and Operation Instructions CHS Series 10 Figure 3-2 Wall Mounting Instructions  While leaving the Upper b

Seite 3

CHS Series Installation and Operation Instructions │ Slant Fin Corp. 11 4.0 GENERAL VENTING The CHS boiler is certified as a “Category I

Seite 4

Slant Fin Corp. │ Installation and Operation Instructions CHS Series 12 and 6 in. from the front of the appliance. The opening shall directly co

Seite 5

CHS Series Installation and Operation Instructions │ Slant Fin Corp. 13 Combustion Air-inlet Contamination Be careful not to locate the air-inlet

Seite 6

Slant Fin Corp. │ Installation and Operation Instructions CHS Series 14 Figure 4-2(a) CHS 85-110 & 300-399 Figure 4-2(b) CHS 85-110 & 30

Seite 7

CHS Series Installation and Operation Instructions │ Slant Fin Corp. 15 Figure 4-2(e) CHS 85-110 & 300-399 Figure 4-2(f) CHS 85-110 & 30

Seite 8

Slant Fin Corp. │ Installation and Operation Instructions CHS Series 16 Table 4-2 CPVC Vent Pipe Transition Piece (used when venting with PVC) M

Seite 9

CHS Series Installation and Operation Instructions │ Slant Fin Corp. 17 Mandatory Pre-commissioning Procedure for Plastic Venting (PVC or CPVC)

Seite 10

Slant Fin Corp. │ Installation and Operation Instructions CHS Series 18 Termination Options – Direct Vent Installation The venting system of

Seite 11 - Slant Fin Corp

CHS Series Installation and Operation Instructions │ Slant Fin Corp. 19 Sidewall Venting Options – Direct Vent Installation Figure 4-3(a) Figur

Seite 12

Slant Fin Corp. │ Installation and Operation Instructions CHS Series 2 Read Before Proceeding If you do not follow these instructions exactly,

Seite 13

Slant Fin Corp. │ Installation and Operation Instructions CHS Series 20 Roof Venting Options – Direct Vent Installation Figure 4-4(a) Figure 4-4

Seite 14

CHS Series Installation and Operation Instructions │ Slant Fin Corp. 21 Sidewall Termination Details – Direct Vent Installation Figure 4-5(a) Fi

Seite 15

Slant Fin Corp. │ Installation and Operation Instructions CHS Series 22  Roof Termination Details – Direct Vent Installation Figure 4-6(a) Fi

Seite 16

CHS Series Installation and Operation Instructions │ Slant Fin Corp. 23 Venting Rules and Guidelines 1. Prevailing Winds: Ensure the vent is loc

Seite 17

Slant Fin Corp. │ Installation and Operation Instructions CHS Series 24 Figure 4-7 Venting Below Grade For installations that exit the wall b

Seite 18

CHS Series Installation and Operation Instructions │ Slant Fin Corp. 25 5.0 VENT/AIR-INLET TERMINATION CLEARANCES The quick reference table be

Seite 19

Slant Fin Corp. │ Installation and Operation Instructions CHS Series 26 Figure 5-1 Termination Clearance Quick Reference Diagram (See Table 5-1

Seite 20

CHS Series Installation and Operation Instructions │ Slant Fin Corp. 27 Extra precaution must be taken to adequately support the weight of the V

Seite 21

Slant Fin Corp. │ Installation and Operation Instructions CHS Series 28 6.0 CONDENSATE DRAIN This unit produces liquid condensate in the hea

Seite 22

CHS Series Installation and Operation Instructions │ Slant Fin Corp. 29 Figure 6-1 Condensate Drain Piping Outlet Retaining Nut firmly tigh

Seite 23

CHS Series Installation and Operation Instructions │ Slant Fin Corp. 3 1.0 INTRODUCTION General Installation Requirements The installation of y

Seite 24 - Wall Brackets

Slant Fin Corp. │ Installation and Operation Instructions CHS Series 30 7.0 INSTALLING GAS PIPING The CHS boiler is factory equipped to ope

Seite 25

CHS Series Installation and Operation Instructions │ Slant Fin Corp. 31 Figure 7-1 Gas Line Connection (Typical) Test all gas piping, inte

Seite 26 - – Minimum 1 ft [305 mm]

Slant Fin Corp. │ Installation and Operation Instructions CHS Series 32 8.0 LIGHTING THE BOILER Before Start-up refer to Mandatory Pre-commiss

Seite 27

CHS Series Installation and Operation Instructions │ Slant Fin Corp. 33 The initial lighting of the boiler must be performed by a lic

Seite 28

Slant Fin Corp. │ Installation and Operation Instructions CHS Series 34 9.0 GAS VALVE AND BURNER SET-UP Set-up of the CHS gas valve must be p

Seite 29

CHS Series Installation and Operation Instructions │ Slant Fin Corp. 35 Manifold Pressure - DO NOT adjust or measure the Manifold Pressure of the

Seite 30

Slant Fin Corp. │ Installation and Operation Instructions CHS Series 36 Figure 9-1 CHS 85-250 Gas Valve and Venturi Assembly (model CHS 85-1

Seite 31

CHS Series Installation and Operation Instructions │ Slant Fin Corp. 37 10.0 BOILER AND HEATING SYSTEM PIPING The fire tube design of the CHS h

Seite 32

Slant Fin Corp. │ Installation and Operation Instructions CHS Series 38 Treatment - Boiler water that falls outside of the conditions l

Seite 33

CHS Series Installation and Operation Instructions │ Slant Fin Corp. 39 Near Boiler Piping (CHS 85-110) Figure 10-1(a) Figure 10-1(b) Supply/

Seite 34

Slant Fin Corp. │ Installation and Operation Instructions CHS Series 4 Failure to use the appropriate Natural to LP Conversion Kit and Orifice wh

Seite 35

Slant Fin Corp. │ Installation and Operation Instructions CHS Series 40 Near Boiler Piping (CHS 155-250) Figure 10-2(a) Figure 10-2(b) Supply/

Seite 36

CHS Series Installation and Operation Instructions │ Slant Fin Corp. 41 Near Boiler Piping (CHS 300-399) Figure 10-3(a) Figure 10-3(b) Supply/

Seite 37

Slant Fin Corp. │ Installation and Operation Instructions CHS Series 42 Boiler System Plumbing The CHS boiler uses a low mass heat exchanger that

Seite 38

CHS Series Installation and Operation Instructions │ Slant Fin Corp. 43 Table 10-4 Circulator and Pipe Size Requirements Model Temp. Rise (ºF) B

Seite 39

Slant Fin Corp. │ Installation and Operation Instructions CHS Series 44 Figure 10-4(a) CHS 85-110 Head Loss Curve 01234562 4 6 8 10 12Flow Rate

Seite 40

CHS Series Installation and Operation Instructions │ Slant Fin Corp. 45 Air Removal – The boiler and system plumbing layout must be configured to

Seite 41

Slant Fin Corp. │ Installation and Operation Instructions CHS Series 46 Indirect Fired Water Heater – When installed as per Figure 10-6, the indi

Seite 42

CHS Series Installation and Operation Instructions │ Slant Fin Corp. 47 Figure 10-5 Primary/Secondary Plumbing (Single System Circulator Con

Seite 43

Slant Fin Corp. │ Installation and Operation Instructions CHS Series 48 Figure 10-6 Primary/Secondary Plumbing (Multiple System Circulator Con

Seite 44 - Flow Rate (US gpm)

CHS Series Installation and Operation Instructions │ Slant Fin Corp. 49 Multiple Boiler Applications The CHS controller has the internal capacity

Seite 45

CHS Series Installation and Operation Instructions │ Slant Fin Corp. 5 IN THE STATE OF MASSACHUSETTS ONLY (a) For all horizontally vented gas fu

Seite 46

Slant Fin Corp. │ Installation and Operation Instructions CHS Series 50 Figure 10-7 Multiple Boiler Lead-Lag Plumbing Configuration (Small DHW

Seite 47

CHS Series Installation and Operation Instructions │ Slant Fin Corp. 51 Figure 10-8 Multiple Boiler Lead-Lag Plumbing Configuration (Large DHW

Seite 48

Slant Fin Corp. │ Installation and Operation Instructions CHS Series 52 11.0 FIELD WIRING All wiring must be in accordance with the Canadian El

Seite 49

CHS Series Installation and Operation Instructions │ Slant Fin Corp. 53 Figure 11-1 Line Voltage Field Wiring Table 11-1 Line Voltage Field

Seite 50 - (Small DHW Requirements)

Slant Fin Corp. │ Installation and Operation Instructions CHS Series 54 Low Voltage Connections Like the line voltage, the low voltage wiring co

Seite 51

CHS Series Installation and Operation Instructions │ Slant Fin Corp. 55 Low Voltage Terminals – “R” terminals 2 and 3 of the 24VAC I/O barrier ha

Seite 52

Slant Fin Corp. │ Installation and Operation Instructions CHS Series 56 Figure 11-3 DHW Input Contacts (Multiple Boilers)

Seite 53

CHS Series Installation and Operation Instructions │ Slant Fin Corp. 57 12.0 WIRING SCHEMATICS Figure 12-1 CHS Connection Diagram

Seite 54

Slant Fin Corp. │ Installation and Operation Instructions CHS Series 58 Figure 12-2 CHS Ladder/Logic Diagram

Seite 55

CHS Series Installation and Operation Instructions │ Slant Fin Corp. 59 13.0 INSTALLATION CHECKLIST Installation  1. If operating on Propa

Seite 56

Slant Fin Corp. │ Installation and Operation Instructions CHS Series 6 2.0 SPECIFICATIONS Table 2-1 CHS Specifications DESCRIPTION CHS-85 CHS-

Seite 57 - WIRING SCHEMATICS

Slant Fin Corp. │ Installation and Operation Instructions CHS Series 60 14.0 ANNUAL MAINTENANCE AND INSPECTION This unit must be inspected at

Seite 58

CHS Series Installation and Operation Instructions │ Slant Fin Corp. 61 Refractory Ceramic Fibers (RFC) Personal Protective Equipment Recomme

Seite 59 - INSTALLATION CHECKLIST

Slant Fin Corp. │ Installation and Operation Instructions CHS Series 62 15.0 TROUBLESHOOTING Observe the following precautions when servicin

Seite 60

CHS Series Installation and Operation Instructions │ Slant Fin Corp. 63 Figure 15-1 CHS Control Panel Figure 14-1 Tft Model Fuses The CHS

Seite 61

Slant Fin Corp. │ Installation and Operation Instructions CHS Series 64 If the Display is not blank, but is displaying “Boiler Search, Modbus add

Seite 62

CHS Series Installation and Operation Instructions │ Slant Fin Corp. 65 displayed is the Home page. Information presented on the Home page includ

Seite 63

Slant Fin Corp. │ Installation and Operation Instructions CHS Series 66 Table 15-1 Troubleshooting Chart PROBLEM POSSIBLE CAUSE CORRECTIVE ACTIO

Seite 64

CHS Series Installation and Operation Instructions │ Slant Fin Corp. 67 Table 15-1 Troubleshooting Chart PROBLEM POSSIBLE CAUSE CORRECTIVE ACTIO

Seite 65

Slant Fin Corp. │ Installation and Operation Instructions CHS Series 68 Table 15-1 Troubleshooting Chart PROBLEM POSSIBLE CAUSE CORRECTIVE ACTIO

Seite 66 - "B"

CHS Series Installation and Operation Instructions │ Slant Fin Corp. 69 Table 15-1 Troubleshooting Chart PROBLEM POSSIBLE CAUSE CORRECTIVE ACTIO

Seite 67

CHS Series Installation and Operation Instructions │ Slant Fin Corp. 7 Figure 2-1 CHS-85-110 Dimensions & Specifications Figure 2-2 CHS-1

Seite 68 - "C"

Slant Fin Corp. │ Installation and Operation Instructions CHS Series 70 Table 15-3 Hold and Lockout Codes Code Description Note 20 Internal fa

Seite 69

CHS Series Installation and Operation Instructions │ Slant Fin Corp. 71 Table 15-3 Hold and Lockout Codes Code Description Note 70 Wait for le

Seite 70

Slant Fin Corp. │ Installation and Operation Instructions CHS Series 72 Table 15-3 Hold and Lockout Codes Code Description Note 127 Low fire s

Seite 71

CHS Series Installation and Operation Instructions │ Slant Fin Corp. 73 Table 15-3 Hold and Lockout Codes Code Description Note 184 Invalid BL

Seite 72

Slant Fin Corp. │ Installation and Operation Instructions CHS Series 74 Table 15-3 Hold and Lockout Codes Code Description Note 233 Invalid IA

Seite 73

CHS Series Installation and Operation Instructions │ Slant Fin Corp. 75 Table 15-4 Alert Codes Code Description 1 Alert PCB was restored from fa

Seite 74

Slant Fin Corp. │ Installation and Operation Instructions CHS Series 76 Table 15-4 Alert Codes Code Description 50 Maximum hours count was reach

Seite 75

CHS Series Installation and Operation Instructions │ Slant Fin Corp. 77 Table 15-4 Alert Codes Code Description 100 CH modulation range (max min

Seite 76

Slant Fin Corp. │ Installation and Operation Instructions CHS Series 78 Table 15-4 Alert Codes Code Description 158 DHW P-gain was invalid 159 D

Seite 77

CHS Series Installation and Operation Instructions │ Slant Fin Corp. 79 Table 15-4 Alert Codes Code Description 207 Lead Lag was suspended due t

Seite 78

Slant Fin Corp. │ Installation and Operation Instructions CHS Series 8 3.0 BOILER LOCATION In all cases, the CHS boiler must be installed indoor

Seite 79

Slant Fin Corp. │ Installation and Operation Instructions CHS Series 80 Table 15-4 Alert Codes Code Description 260 RESERVED 261 DHW set point w

Seite 80

CHS Series Installation and Operation Instructions │ Slant Fin Corp. 81 Table 15-4 Alert Codes Code Description 309 Abnormal Recycle: ILK off du

Seite 81

Slant Fin Corp. │ Installation and Operation Instructions CHS Series 82 Table 15-4 Alert Codes Code Description 358 Abnormal Recycle: DHW high l

Seite 82

CHS Series Installation and Operation Instructions │ Slant Fin Corp. 83 Table 15-4 Alert Codes Code Description 468 Internal error: EEPROM cycle

Seite 83

Slant Fin Corp. │ Installation and Operation Instructions CHS Series 84 Table 15-4 Alert Codes Code Description 616 Range PCB was switched to ba

Seite 84

CHS Series Installation and Operation Instructions │ Slant Fin Corp. 85 16.0 PARTS LIST For a list of parts that corresponds to the item numbe

Seite 85 - PARTS LIST

Slant Fin Corp. │ Installation and Operation Instructions CHS Series 86 Figure 16-1(b) CHS Cabinet Cabinet, Vent and Air-Inlet Parts Figure 16

Seite 86

CHS Series Installation and Operation Instructions │ Slant Fin Corp. 87 Figure 16-1(d) CHS Installation Kit Table 16-1 Parts List: Item Mod

Seite 87

Slant Fin Corp. │ Installation and Operation Instructions CHS Series 88 Item Model Part Number Description 8 CHS 300-399 (NG) 81 8029 000 Gas Val

Seite 88

CHS Series Installation and Operation Instructions │ Slant Fin Corp. 89 Item Model Part Number Description 35 CHS 85-399 81 8050 000 Flue Sensor

Seite 89

CHS Series Installation and Operation Instructions │ Slant Fin Corp. 9 Figure 3-1 Closet Installation, Minimum Clearances (Model CHS 85-110 Sh

Seite 90

Slant Fin Corp. │ Installation and Operation Instructions CHS Series 90 Item Model Part Number Description 72 CHS 85-399 81 8062 000 Condensate T

Seite 91

CHS Series Installation and Operation Instructions │ Slant Fin Corp. 91 NOTES

Seite 92 - 1014 • PUBLICATION CHS-40

SLANT/FIN CORPORATION, Greenvale, N.Y. 11548 • Phone: (516) 484-2600FAX: (516) 484-5921 • Canada: Slant/Fin LTD/LT EE , Mississauga, Ontariowww.slantf

Verwandte Modelle: CHS-85

Kommentare zu diesen Handbüchern

Keine Kommentare