Slant Fin Corp. │ Installation and Operation Instructions CHS Series 10 Figure 3-2 Wall Mounting Instructions While leaving the Upper b
CHS Series Installation and Operation Instructions │ Slant Fin Corp. 11 4.0 GENERAL VENTING The CHS boiler is certified as a “Category I
Slant Fin Corp. │ Installation and Operation Instructions CHS Series 12 and 6 in. from the front of the appliance. The opening shall directly co
CHS Series Installation and Operation Instructions │ Slant Fin Corp. 13 Combustion Air-inlet Contamination Be careful not to locate the air-inlet
Slant Fin Corp. │ Installation and Operation Instructions CHS Series 14 Figure 4-2(a) CHS 85-110 & 300-399 Figure 4-2(b) CHS 85-110 & 30
CHS Series Installation and Operation Instructions │ Slant Fin Corp. 15 Figure 4-2(e) CHS 85-110 & 300-399 Figure 4-2(f) CHS 85-110 & 30
Slant Fin Corp. │ Installation and Operation Instructions CHS Series 16 Table 4-2 CPVC Vent Pipe Transition Piece (used when venting with PVC) M
CHS Series Installation and Operation Instructions │ Slant Fin Corp. 17 Mandatory Pre-commissioning Procedure for Plastic Venting (PVC or CPVC)
Slant Fin Corp. │ Installation and Operation Instructions CHS Series 18 Termination Options – Direct Vent Installation The venting system of
CHS Series Installation and Operation Instructions │ Slant Fin Corp. 19 Sidewall Venting Options – Direct Vent Installation Figure 4-3(a) Figur
Slant Fin Corp. │ Installation and Operation Instructions CHS Series 2 Read Before Proceeding If you do not follow these instructions exactly,
Slant Fin Corp. │ Installation and Operation Instructions CHS Series 20 Roof Venting Options – Direct Vent Installation Figure 4-4(a) Figure 4-4
CHS Series Installation and Operation Instructions │ Slant Fin Corp. 21 Sidewall Termination Details – Direct Vent Installation Figure 4-5(a) Fi
Slant Fin Corp. │ Installation and Operation Instructions CHS Series 22 Roof Termination Details – Direct Vent Installation Figure 4-6(a) Fi
CHS Series Installation and Operation Instructions │ Slant Fin Corp. 23 Venting Rules and Guidelines 1. Prevailing Winds: Ensure the vent is loc
Slant Fin Corp. │ Installation and Operation Instructions CHS Series 24 Figure 4-7 Venting Below Grade For installations that exit the wall b
CHS Series Installation and Operation Instructions │ Slant Fin Corp. 25 5.0 VENT/AIR-INLET TERMINATION CLEARANCES The quick reference table be
Slant Fin Corp. │ Installation and Operation Instructions CHS Series 26 Figure 5-1 Termination Clearance Quick Reference Diagram (See Table 5-1
CHS Series Installation and Operation Instructions │ Slant Fin Corp. 27 Extra precaution must be taken to adequately support the weight of the V
Slant Fin Corp. │ Installation and Operation Instructions CHS Series 28 6.0 CONDENSATE DRAIN This unit produces liquid condensate in the hea
CHS Series Installation and Operation Instructions │ Slant Fin Corp. 29 Figure 6-1 Condensate Drain Piping Outlet Retaining Nut firmly tigh
CHS Series Installation and Operation Instructions │ Slant Fin Corp. 3 1.0 INTRODUCTION General Installation Requirements The installation of y
Slant Fin Corp. │ Installation and Operation Instructions CHS Series 30 7.0 INSTALLING GAS PIPING The CHS boiler is factory equipped to ope
CHS Series Installation and Operation Instructions │ Slant Fin Corp. 31 Figure 7-1 Gas Line Connection (Typical) Test all gas piping, inte
Slant Fin Corp. │ Installation and Operation Instructions CHS Series 32 8.0 LIGHTING THE BOILER Before Start-up refer to Mandatory Pre-commiss
CHS Series Installation and Operation Instructions │ Slant Fin Corp. 33 The initial lighting of the boiler must be performed by a lic
Slant Fin Corp. │ Installation and Operation Instructions CHS Series 34 9.0 GAS VALVE AND BURNER SET-UP Set-up of the CHS gas valve must be p
CHS Series Installation and Operation Instructions │ Slant Fin Corp. 35 Manifold Pressure - DO NOT adjust or measure the Manifold Pressure of the
Slant Fin Corp. │ Installation and Operation Instructions CHS Series 36 Figure 9-1 CHS 85-250 Gas Valve and Venturi Assembly (model CHS 85-1
CHS Series Installation and Operation Instructions │ Slant Fin Corp. 37 10.0 BOILER AND HEATING SYSTEM PIPING The fire tube design of the CHS h
Slant Fin Corp. │ Installation and Operation Instructions CHS Series 38 Treatment - Boiler water that falls outside of the conditions l
CHS Series Installation and Operation Instructions │ Slant Fin Corp. 39 Near Boiler Piping (CHS 85-110) Figure 10-1(a) Figure 10-1(b) Supply/
Slant Fin Corp. │ Installation and Operation Instructions CHS Series 4 Failure to use the appropriate Natural to LP Conversion Kit and Orifice wh
Slant Fin Corp. │ Installation and Operation Instructions CHS Series 40 Near Boiler Piping (CHS 155-250) Figure 10-2(a) Figure 10-2(b) Supply/
CHS Series Installation and Operation Instructions │ Slant Fin Corp. 41 Near Boiler Piping (CHS 300-399) Figure 10-3(a) Figure 10-3(b) Supply/
Slant Fin Corp. │ Installation and Operation Instructions CHS Series 42 Boiler System Plumbing The CHS boiler uses a low mass heat exchanger that
CHS Series Installation and Operation Instructions │ Slant Fin Corp. 43 Table 10-4 Circulator and Pipe Size Requirements Model Temp. Rise (ºF) B
Slant Fin Corp. │ Installation and Operation Instructions CHS Series 44 Figure 10-4(a) CHS 85-110 Head Loss Curve 01234562 4 6 8 10 12Flow Rate
CHS Series Installation and Operation Instructions │ Slant Fin Corp. 45 Air Removal – The boiler and system plumbing layout must be configured to
Slant Fin Corp. │ Installation and Operation Instructions CHS Series 46 Indirect Fired Water Heater – When installed as per Figure 10-6, the indi
CHS Series Installation and Operation Instructions │ Slant Fin Corp. 47 Figure 10-5 Primary/Secondary Plumbing (Single System Circulator Con
Slant Fin Corp. │ Installation and Operation Instructions CHS Series 48 Figure 10-6 Primary/Secondary Plumbing (Multiple System Circulator Con
CHS Series Installation and Operation Instructions │ Slant Fin Corp. 49 Multiple Boiler Applications The CHS controller has the internal capacity
CHS Series Installation and Operation Instructions │ Slant Fin Corp. 5 IN THE STATE OF MASSACHUSETTS ONLY (a) For all horizontally vented gas fu
Slant Fin Corp. │ Installation and Operation Instructions CHS Series 50 Figure 10-7 Multiple Boiler Lead-Lag Plumbing Configuration (Small DHW
CHS Series Installation and Operation Instructions │ Slant Fin Corp. 51 Figure 10-8 Multiple Boiler Lead-Lag Plumbing Configuration (Large DHW
Slant Fin Corp. │ Installation and Operation Instructions CHS Series 52 11.0 FIELD WIRING All wiring must be in accordance with the Canadian El
CHS Series Installation and Operation Instructions │ Slant Fin Corp. 53 Figure 11-1 Line Voltage Field Wiring Table 11-1 Line Voltage Field
Slant Fin Corp. │ Installation and Operation Instructions CHS Series 54 Low Voltage Connections Like the line voltage, the low voltage wiring co
CHS Series Installation and Operation Instructions │ Slant Fin Corp. 55 Low Voltage Terminals – “R” terminals 2 and 3 of the 24VAC I/O barrier ha
Slant Fin Corp. │ Installation and Operation Instructions CHS Series 56 Figure 11-3 DHW Input Contacts (Multiple Boilers)
CHS Series Installation and Operation Instructions │ Slant Fin Corp. 57 12.0 WIRING SCHEMATICS Figure 12-1 CHS Connection Diagram
Slant Fin Corp. │ Installation and Operation Instructions CHS Series 58 Figure 12-2 CHS Ladder/Logic Diagram
CHS Series Installation and Operation Instructions │ Slant Fin Corp. 59 13.0 INSTALLATION CHECKLIST Installation 1. If operating on Propa
Slant Fin Corp. │ Installation and Operation Instructions CHS Series 6 2.0 SPECIFICATIONS Table 2-1 CHS Specifications DESCRIPTION CHS-85 CHS-
Slant Fin Corp. │ Installation and Operation Instructions CHS Series 60 14.0 ANNUAL MAINTENANCE AND INSPECTION This unit must be inspected at
CHS Series Installation and Operation Instructions │ Slant Fin Corp. 61 Refractory Ceramic Fibers (RFC) Personal Protective Equipment Recomme
Slant Fin Corp. │ Installation and Operation Instructions CHS Series 62 15.0 TROUBLESHOOTING Observe the following precautions when servicin
CHS Series Installation and Operation Instructions │ Slant Fin Corp. 63 Figure 15-1 CHS Control Panel Figure 14-1 Tft Model Fuses The CHS
Slant Fin Corp. │ Installation and Operation Instructions CHS Series 64 If the Display is not blank, but is displaying “Boiler Search, Modbus add
CHS Series Installation and Operation Instructions │ Slant Fin Corp. 65 displayed is the Home page. Information presented on the Home page includ
Slant Fin Corp. │ Installation and Operation Instructions CHS Series 66 Table 15-1 Troubleshooting Chart PROBLEM POSSIBLE CAUSE CORRECTIVE ACTIO
CHS Series Installation and Operation Instructions │ Slant Fin Corp. 67 Table 15-1 Troubleshooting Chart PROBLEM POSSIBLE CAUSE CORRECTIVE ACTIO
Slant Fin Corp. │ Installation and Operation Instructions CHS Series 68 Table 15-1 Troubleshooting Chart PROBLEM POSSIBLE CAUSE CORRECTIVE ACTIO
CHS Series Installation and Operation Instructions │ Slant Fin Corp. 69 Table 15-1 Troubleshooting Chart PROBLEM POSSIBLE CAUSE CORRECTIVE ACTIO
CHS Series Installation and Operation Instructions │ Slant Fin Corp. 7 Figure 2-1 CHS-85-110 Dimensions & Specifications Figure 2-2 CHS-1
Slant Fin Corp. │ Installation and Operation Instructions CHS Series 70 Table 15-3 Hold and Lockout Codes Code Description Note 20 Internal fa
CHS Series Installation and Operation Instructions │ Slant Fin Corp. 71 Table 15-3 Hold and Lockout Codes Code Description Note 70 Wait for le
Slant Fin Corp. │ Installation and Operation Instructions CHS Series 72 Table 15-3 Hold and Lockout Codes Code Description Note 127 Low fire s
CHS Series Installation and Operation Instructions │ Slant Fin Corp. 73 Table 15-3 Hold and Lockout Codes Code Description Note 184 Invalid BL
Slant Fin Corp. │ Installation and Operation Instructions CHS Series 74 Table 15-3 Hold and Lockout Codes Code Description Note 233 Invalid IA
CHS Series Installation and Operation Instructions │ Slant Fin Corp. 75 Table 15-4 Alert Codes Code Description 1 Alert PCB was restored from fa
Slant Fin Corp. │ Installation and Operation Instructions CHS Series 76 Table 15-4 Alert Codes Code Description 50 Maximum hours count was reach
CHS Series Installation and Operation Instructions │ Slant Fin Corp. 77 Table 15-4 Alert Codes Code Description 100 CH modulation range (max min
Slant Fin Corp. │ Installation and Operation Instructions CHS Series 78 Table 15-4 Alert Codes Code Description 158 DHW P-gain was invalid 159 D
CHS Series Installation and Operation Instructions │ Slant Fin Corp. 79 Table 15-4 Alert Codes Code Description 207 Lead Lag was suspended due t
Slant Fin Corp. │ Installation and Operation Instructions CHS Series 8 3.0 BOILER LOCATION In all cases, the CHS boiler must be installed indoor
Slant Fin Corp. │ Installation and Operation Instructions CHS Series 80 Table 15-4 Alert Codes Code Description 260 RESERVED 261 DHW set point w
CHS Series Installation and Operation Instructions │ Slant Fin Corp. 81 Table 15-4 Alert Codes Code Description 309 Abnormal Recycle: ILK off du
Slant Fin Corp. │ Installation and Operation Instructions CHS Series 82 Table 15-4 Alert Codes Code Description 358 Abnormal Recycle: DHW high l
CHS Series Installation and Operation Instructions │ Slant Fin Corp. 83 Table 15-4 Alert Codes Code Description 468 Internal error: EEPROM cycle
Slant Fin Corp. │ Installation and Operation Instructions CHS Series 84 Table 15-4 Alert Codes Code Description 616 Range PCB was switched to ba
CHS Series Installation and Operation Instructions │ Slant Fin Corp. 85 16.0 PARTS LIST For a list of parts that corresponds to the item numbe
Slant Fin Corp. │ Installation and Operation Instructions CHS Series 86 Figure 16-1(b) CHS Cabinet Cabinet, Vent and Air-Inlet Parts Figure 16
CHS Series Installation and Operation Instructions │ Slant Fin Corp. 87 Figure 16-1(d) CHS Installation Kit Table 16-1 Parts List: Item Mod
Slant Fin Corp. │ Installation and Operation Instructions CHS Series 88 Item Model Part Number Description 8 CHS 300-399 (NG) 81 8029 000 Gas Val
CHS Series Installation and Operation Instructions │ Slant Fin Corp. 89 Item Model Part Number Description 35 CHS 85-399 81 8050 000 Flue Sensor
CHS Series Installation and Operation Instructions │ Slant Fin Corp. 9 Figure 3-1 Closet Installation, Minimum Clearances (Model CHS 85-110 Sh
Slant Fin Corp. │ Installation and Operation Instructions CHS Series 90 Item Model Part Number Description 72 CHS 85-399 81 8062 000 Condensate T
CHS Series Installation and Operation Instructions │ Slant Fin Corp. 91 NOTES
SLANT/FIN CORPORATION, Greenvale, N.Y. 11548 • Phone: (516) 484-2600FAX: (516) 484-5921 • Canada: Slant/Fin LTD/LT EE , Mississauga, Ontariowww.slantf